Curriculum Vitae
Here you can find my Curriculum Vitae (click on the following links in order to jump to the related sections):
Education
|
Work experience
|
Responsibilities
|
Teaching experiences
|
Journal Publications
|
Conference Publications
|
Peer Reviewer
|
Certificates of Achievement
|
Professional associations
|
Languages
|
Petroleum software
|
Computer skills
|
Fields of expertise
|
Current research interests
Education
- 2010 – ongoing: PHD in Petroleum Engineering; Heriot-Watt University , Edinburgh, UK.
- 2006 – 2008: Doctorate in Petroleum Engineering; University of Leoben, Leoben, Austria; registered for 4 Semester (Not accomplished due to lack of funds).
- Taken courses : Reservoir Engineering Methods, Thermodynamic and Heat Transfer, Reservoir Simulation
- Proposed Thesis: Pseudo Well Blocks Model, a new approach for representation of wells in reservoir simulation; Supervisor: Prof. Z. Heinemann
- Sep 2001 – Feb 2003: (in English) Master of Sciences (M.Sc.) in Reservoir Geosciences and Engineering; IFP-School, Rueil Malmaison, Paris, France;
- Qualification: Grade A
- Taken courses: Fundamentals of Geosciences, Fundamental of Reservoir Engineering, Well Testing and Interpretation, Well Logging, Production Mechanisms, Seismic Acquisition, Processing & Interpretation., Clastic Reservoirs & Management of Heterogeneities, Reservoir Simulation, Enhanced Oil Recovery, and Fractured Reservoirs
- Thesis: Full-Field Simulation Model Update, History Matching and Reservoir Uncertainty Study of Koma field.
- Sep 1996 – Sep 2000: Bachelor of Sciences (B.Sc.) in Mining - Exploration; Amir-Kabir University of Technology, Tehran, Iran.
- Qualification: Grade A (ranked no. 2 out of 25).
- Some taken courses: General Geology, Structural Geology, Mathematics, Fluid Mechanics, Thermodynamic, Geochemistry, Geophysics, Well-Logging, etc
- Thesis: Geochemical Analysis of Copper Anomalies in Regional Scale; South-east of Iran.
- Sep 1992 –Jul 1996 Diploma in Mathematics and Physics; Emam High-School, Piranshahr, Iran.
- Qualification: Grade A (ranked no. 2 out of 21).
Work experience
- Feb 2010 – now: Research Assosciate; Institute of Petroleum Engineering (IPE), Heriot-Watt University, Edinburgh, UK.
- Feb 2010 – now: A Novel Approach to Uncertainty Quantification and Risk Assessment in Petroleum Reservoir Developments; Joint research project with BP Exploration, Sunbury, UK; Analyze, Design, Code, Debug, and Test; Ongoing Project
- Mar 2003 – Jan 2010: Researcher / Reservoir Engineer; Research Institute of Petroleum Industry (RIPI), E&P Centre, Tehran, Iran.
- Mar 2006 – Jan 2010: Development of Native Iranian Reservoir Simulator Software; Joint-Venture research project with HOL, Leoben, Austria; Analyze, Design, Code, Debug, and Test; Ongoing Project
- Oct 2005 – Feb 2007: Reservoir Management Study of three Iranian Giant Oil Fields; Project Leader
- Aug 2005 – Apr 2006: Alborz Full Field Study (FFS) and Master Development Plan (MDP); Reservoir simulation and prediction
- Aug 2004 – Apr 2005: Azadegan Full Field Study (FFS); Reservoir simulation, prediction, and uncertainty analysis
- Aug 2004 – Aug 2005: Yadavaran Full Field Study (FFS) and Master Development Plan (MDP); Reservoir simulation, prediction, and economic analysis
- Oct 2003 – May 2004: Ahwaz Master Development Plan (MDP); Cost estimation and economic analysis
- Mar 2003 – Oct 2003: Bibi-Hakimeh Master Development Plan (MDP); Economic and risk analysis
- Sep 2002 – Jan 2003: Intern; Subsurface Options Team, NBU, BP, Aberdeen, UK;
- Full-Field Simulation Model Update and Reservoir Uncertainty Study of Koma field
- Achievement: Proved additional 20 MMSCF recoverable oil
Responsibilities
- RIPI (Research Institute of Petroleum Industry), E&P Centre, Tehran, Iran.
- Jul 2008 – Jun 2009: Member of RIPI Software Council
- Achievement: Represented E&P Directorate, drafted Software Council's statute.
- May 2008 - Jun 2009: Member of RIPI's Postgraduate Council
- Achievement: Represented E&P Directorate, suggested new ideas and strategies.
- Mar 2006 – Jun 2009: Head of Master Plan for Development of Reservoir Dynamic Modeling and Simulation packages; Totally 9 Standalone Projects in Reservoir Engineering Domain.
- Achievement: Planned and managed totally 5 software development projects in reservoir engineering domain.
- Mar 2006 – Jun 2009: Team LeaderDevelopment of Native Iranian Fractured Reservoirs Simulator Software;
- Achievement: Build from scratch and managed a team of 10 reservoir engineers, programmers and mathematicians using modern methodologies.
- Apr 2005 – Mar 2007: Training Coordinator and Course Designer; RIPI Training Center;
- Achievement: Implemented short modeling and simulation training course for new recruits — increasing profitability, plus designed Integrated Reservoir Geosciences and Engineering (IRGE) program for the first time.
- Oct 2005 – Feb 2007: Project ManagerReservoir Management Study of three Giant Iranian Oil Fields.
-
- Achievement: Managed project by a team of 7 reservoir engineers, geologist, and consultants.
Teaching experiences
- Engineering Economy; One week course / three years, RIPI Training Centre for professionals.
- Economic Analysis of Petroleum Projects; One week course/ three years, RIPI Training Centre for professionals.
- Reservoir Uncertainty Study; One week course/ three years, at RIPI Training Centre for professionals.
Journal publications
- Abdollahzadeh A., Hosseini M., Zargar Gh. (2009). The Quantification of Uncertainty in Reservoir Production Prediction: An Iranian Gas Field Case Study ; Amir-Kabir Modeling Journal (Research and Scientific), March 2009. Tehran, Iran.
- Abdollahzadeh, A. (2006). The Quantification and Evaluation of Uncertainty in an Oil Field Reserves (In Persian). Amir-Kabir Journal (Research and Scientific), March 2007. Tehran, Iran.
Conference publications
- Reynolds, A., Abdollahzadeh, A., Christie, M., Corne, D., Williams, G., Davies, B. (2011). A Parallel BOA-PSO Hybrid Algorithm for History Matching. 2011 IEEE Congress on Evolutionary Computation, June 5-8, 2011. New Orleans, U.S.A.
- Abdollahzadeh, A., Reynolds, A., Christie, M., Corne, D., Davies, B., Williams, G. (2011). Bayesian Optimization Algorithm Applied to Uncertainty Quantification. SPE Number: 143290-MS. SPE EUROPEC/EAGE Annual Conference and Exhibition, 23–26 May 2011. Vienna, Austria.
- Abdollahzadeh, A., Reynolds, A., Christie, M., Corne, D., Williams, G., Davies, B. (2011). Estimation of Distribution Algorithms Applied to History Matching. SPE Number: 141161-MS. SPE Reservoir Simulation Symposium, 21-23 February 2011. Houston, Texas, U.S.A.
- Ghaemian, N., Abdollahzadeh, A., Heinemann, Z., Beyrami, H., Harrer, A., Sharifi, M., Heinemann, G. (2008). Accelerating the GMRES Iterative Linear Solver of an Oil Reservoir Simulator using the Multi-Processing Power of Compute Unified Device Architecture of Graphics Cards. 9th International Workshop on State-of-the-Art in Scientific and Parallel Computing (PARA 2008), May 13-16. NTNU, Trondheim, Norway.
- Abdollahzadeh A., Hosseini M., Zargar Gh. (2005). The Quantification of Uncertainty in Production Prediction: Case Study an Iranian Gas Field; First Iranian Petroleum Engineering Congress (Iran Upstream 2006), 30-31 May 2006. Tehran, Iran.
Peer reviewer
Certificates of achievement
- Well-Testing Analysis with Saphir; 31.05.2009 – 03.06.2009; RIPI Training Center, Tehran, Iran.
- Reservoir Rock Mechanics; 06.02.2009 – 11.06.2009; by Prof. M.B. Dosseault; RIPI Training Center, Tehran, Iran.
- Gap and Prosper Software Training Course; 06.06.2009 – 09.06.2009; RIPI Training Center, Tehran, Iran.
- Professional Ethic Seminar; 13.05.2008; RIPI Training Center, Tehran, Iran.
- Virtual Property and Patent Registering Seminar; 11.10.2006; RIPI Training Center, Tehran, Iran.
- Economics and Management of Exploration and Production; 17.11.2007 – 20.11.2007; by Prof. G. Darmois; ENSP Formation Industry (IFP Training) and Petropars Oil and Gas Institute, Tehran, Iran.
- SimOpt Software Training Course; 30.09.2006 – 04.10.2006; ICOFC; Tehran, Iran.
- Advanced Excel and Its Applications in Engineering Problem Solving; 12.08.2006 – 15.08.2006; RIPI Training Center, Tehran, Iran.
- C++ Programming; 29.07.2006 – 31.07.2006; RIPI Training Center, Tehran, Iran.
- FORTRAN Programming; 13.05.2006 – 16.05.2006; RIPI Training Center, Tehran, Iran.
- ISO Standard Requirements; 03.01.2006; RIPI Training Center, Tehran, Iran.
- Integrated Surface/ Subsurface Modeling – Impact on Field Planning; 17.12.2005 – 21.12.2005; by Dr. K. Ghorayeb, RIPI Training Center, Tehran, Iran.
- Application of Artificial Neural Network in Reservoir Studies; 31.07.2005 – 01.08.2005; by Dr. F. Aminzadeh, RIPI Training Center, Tehran, Iran.
- Introduction to Decision Tool Kit and Risk Analysis; 19.07.2005 – 20.07.2005; by Schlumberger, RIPI Training Center, Tehran, Iran.
- Integrated Fracture Modeling; 04.12.2004 – 06.12.2004; by Dr. A. Zellou, RIPI Training Center, Tehran, Iran.
- IPM (Integrated Petroleum Modeling); 15.08.2004; by Petroleum Experts, RIPI Training Center, Tehran, Iran.
- Gas and Water Injection in Unfractured and Fractured Reservoirs – Experiments, Theory and Numerical Modeling; 21.02.2004 – 25.02.2004; by Prof. A. Firoozabadi, RIPI Training Center, Tehran, Iran.
Professional associations
- href="http://www.spe.org">Society of Petroleum Engineers (SPE); Member
Languages
- Kurdish: Mother tongue
- Persian: Native speaker
- English: Proficient written and spoken English
- French: Elementary
- Arabic: Elementary
Petroleum software
- Reservoir Simulation: Eclipse, VIP, PRS, Sure, Athos
- Geological Modeling: Petrel, Geolog, RMS
- Economic Analysis: Peep, DTK
- Seismic: Charisma, Petrel
- Production Modeling: IPM (Mbal, Prosper, Gap), Saphir
- Fracture Modeling: Refract, Fraca
Computer skills
- Operating Systems: Windows XP, Windows Server 2003, Windows Vista , Windows Server 2008, and Linux
- General Softwares: Office XP - 2007, Photoshop, SPSS, Statistica, etc
- Application Programming: Python, FORTRAN, C#, C, C++, VB, VB.Net, VBA, Perl, and Pascal
- Web Programming: HTML, CSS, JavaScript, And ASP
- Software Methodology: Agile( Scrum, XP), and RUP
- Project Management: Microsoft Project 2007
Fields of expertise
- Reservoir Uncertainty Quantification
- Reservoir Simulation and History-Matching
- Team Leading and Project Management
- Development of Reservoir Simulation Software
- Software Development Methodology
- Economic and Risk Analysis
- Lecturing and Presentation
Current research interests
- Automated Reservoir History-Matching, Optimisation, and Uncertainty Quantification
- Reservoir Simulation (Next-Generation Reservoir Simulators)
- Modeling of Naturally Fractured Reservoirs
- Reservoir Geomechanics (Coupling Geomechanics with Fluid-Flow in Porous Media)
- High Performance Computing in Reservoir Simulation